欧美妺子操一操_JULIA国产一区二区在线精品_无码吃逼操视频_黄色一级香蕉视频_WWW.cok操逼_亚洲色区爱_色噜噜影视_熟女日本视频_欧美 激情 另类 自拍_亚洲精品乱码久久久久久蜜桃明_淑女乱伦第一页_精品九九久久_ⅴ天堂在线_成人性爱在线性爱电影_国产V日韩

Language:CHINESESENGLISH

Home > News > How to design the detailed drawings before the start of the steel structure project?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.applebabes.com

How to design the detailed drawings before the start of the steel structure project?

Time:[2019-2-23]  Hits:4591

The detailed drawing design of steel structure engineering is generally carried out by processing units. In order to meet this new requirement, a steel structure engineering should generally follow the following working order:
Factory Detailed Drawing Design Technical Design Unit Examination and Approval Detailed Drawing
Steel Structure Processing, Finished Product Transportation, Field Installation
Material Order Material Transportation Material Transportation
Detailed drawing design in the processing plant has the advantage of combining plant conditions and construction habits, easy to use advanced technology and high economic benefits. Detailed drawings shall be designed in accordance with the technical design drawings of the construction units and the specifications, standards and requirements specified in the contract documents. This requires the construction unit to have sufficient level of detailed drawing design ability.
In order to purchase (order) steel as soon as possible, steel should be ordered at the same time of detailed design. In this way, when the detailed drawings are approved, the steel can arrive and start production immediately.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號