欧美妺子操一操_JULIA国产一区二区在线精品_无码吃逼操视频_黄色一级香蕉视频_WWW.cok操逼_亚洲色区爱_色噜噜影视_熟女日本视频_欧美 激情 另类 自拍_亚洲精品乱码久久久久久蜜桃明_淑女乱伦第一页_精品九九久久_ⅴ天堂在线_成人性爱在线性爱电影_国产V日韩

Language:CHINESESENGLISH

Home > News > construction steel structure fire regulations
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.applebabes.com

construction steel structure fire regulations

Time:[2016-1-27]  Hits:4745

Guangzhou Steel tells you: construction steel structure fire regulations


1. Guangzhou fireproof coating protected by trained and qualified construction professional construction team. Construction of security technology and labor protection requirements, should be the existing relevant provisions of the state.
2. When the steel structure in place, the boom connected thereto, a horse track, pipe racks and other related components even installed, and after passing the acceptance, before proceeding fireproof coating.
3. Before construction, steel surfaces should be rust, and determine in accordance with the requirements of anti-rust treatment. Rust and rust treatment should comply with "Steel Construction and acceptance norms" in the relevant provisions.
4. steel surface debris should be cleaned, cracks or other fire use fire-resistant coating material which is connected at the block level before construction fill.
5. fire retardant coating construction should be carried out before the next interior decoration and are not damaged by the subsequent engineering conditions. When construction on the site and other objects need for fire protection shielding should be protected, just construction coating should prevent dirty fluid contamination and mechanical shocks.
6. Before the construction process and the coating is dried and solidified, the ambient temperature should be maintained at 5 ~ 38 ℃, relative humidity not more than 90%, the air should circulate. When the wind speed is greater than 5m / s, or rain and member surface condensation, not a job.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)